TY - GEN
T1 - Design of a prefeasibility model of costs for the construction of a veredal sewer in Cundinamarca, for a medium company
AU - Castiblanco, Pedro
AU - Candil, Diego Culma
AU - Otalora, Francisco
AU - Alfonso, Olga Lucia Vanegas
AU - Diaz-Piraquive, Flor Nancy
N1 - Funding Information:
[8] Project Management Institute, Guía de los Fundamentos para la Dirección de Proyectos Guía del PMBOK®, 5 ed., Newtown Square, Pensilvania: PMI, 2013.
Funding Information:
Olga Lucía Vanegas Alfonso Universidad Católica de Colombia Bogotá D.C., Colombia [email protected] Resumen: En el presente artículo se dan a conocer los resultados del trabajo denominado “Diseño De un Modelo de Costos a Nivel de Prefactibilidad para la Construcción de un Alcantarillado Veredal en Cundinamarca, Desarrollada por una Mediana Empresa”, el cual tuvo como propósito servir como una herramienta de trabajo gerencial que le permita a medianas empresas, analizar y facilitar la toma de decisiones respecto a la conveniencia económica para presentar ofertas técnico económica para la construcción de este tipo de obras a nivel del departamento de Cundinamarca, dado que las mismas corresponden a obras de saneamiento rural enmarcadas dentro de programadas realizados por la Empresa de Acueducto,. Alcantarillado y Aseo de Bogotá S.A. E.S.P., EAB S.A. ESP, adscrita a la Secretaría del Hábitat. Para lo anterior, se consideraron fundamentos teóricos del sistema de costos ABC como una herramienta útil de análisis de costo y seguimiento de actividades en combinación con los procesos gerenciales descritos en el PMBOK 5 edición, en la gestión de costos; metodologías que tratan de orientar a la gerencia empresarial para que en forma eficiente puedan obtener mejor desempeño y llegar a un resultado con mayor satisfacción, además que les permitirá la toma de decisiones de alto nivel.
Funding Information:
A partir de los APUs, y características específicas de cada proyecto de acuerdo a su localización, se hace una parametrización de las tres obras en cuestión para así obtener el Costo Indirecto – enmarcados en el contexto del AIU, donde (A) corresponde a la Administración, (I) a los imprevistos que en nuestro caso se refiere a los Riesgos y la (U), es la utilidad esperada por la Organización.
Funding Information:
Siendo así, la unión de esta información se plasma en un plantilla formulada que contiene el MODELO DE COSTOS A NIVEL DE PREFACTIBILIDAD PARA LA CONSTRUCCIÓN DE UN ALCANTARILLADO VEREDAL, el cual, por medio de recolección de información básica del Proyecto, su localización y la incorporación de medidas claves de las obras a ejecutar, el modelo confirma un valor estimado de prefactibilidad para el futuro negocio y le indicará a través de un mensaje final si el negocio es “VIABLE PARA PRESENTAR PROPUESTA” o “NO SE RECOMEINDA”.
Publisher Copyright:
© 2017 IEEE.
PY - 2018/1/29
Y1 - 2018/1/29
N2 - In the present article, the results of the work entitled 'Design of a Prefeasibility Cost Model for the Construction of a Veredal Sewer in Cundinamarca, Developed by a Medium Enterprise' are presented. Medium-sized companies, analyze and facilitate the decision-making in the economic convenience to present economic technical offers for the construction of this type of works a department level of Cundinamarca, given that these correspond to Rural sanitation works framed within programs carried out by The Aqueduct Company,. Sewerage and Cleaning of Bogotá S.A. E.S.P., EAB S.A. ESP, attached to the Habitat Secretariat. For the above, the theoretical basis of the ABC cost system is considered as a tool for cost analysis and monitoring of activities in combination with management processes in the PMBOK 5 edition, in cost management; Methodologies that try to guide business management so that it efficiently and get better performance and arrive at a result with greater satisfaction, in addition to making high-level decision making.
AB - In the present article, the results of the work entitled 'Design of a Prefeasibility Cost Model for the Construction of a Veredal Sewer in Cundinamarca, Developed by a Medium Enterprise' are presented. Medium-sized companies, analyze and facilitate the decision-making in the economic convenience to present economic technical offers for the construction of this type of works a department level of Cundinamarca, given that these correspond to Rural sanitation works framed within programs carried out by The Aqueduct Company,. Sewerage and Cleaning of Bogotá S.A. E.S.P., EAB S.A. ESP, attached to the Habitat Secretariat. For the above, the theoretical basis of the ABC cost system is considered as a tool for cost analysis and monitoring of activities in combination with management processes in the PMBOK 5 edition, in cost management; Methodologies that try to guide business management so that it efficiently and get better performance and arrive at a result with greater satisfaction, in addition to making high-level decision making.
UR - http://www.scopus.com/inward/record.url?scp=85047323930&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85047323930&partnerID=8YFLogxK
U2 - 10.1109/CONIITI.2017.8273357
DO - 10.1109/CONIITI.2017.8273357
M3 - Conference contribution
AN - SCOPUS:85047323930
T3 - 2017 Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2017 - Conference Proceedings
SP - 1
EP - 6
BT - 2017 Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2017 - Conference Proceedings
A2 - Lozano-Garzon, Carlos Andres
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2017 Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2017 - 2017 International Conference on Innovation and Trends in Engineering, CONIITI 2017
Y2 - 4 October 2017 through 6 October 2017
ER -