Resumen
This paper shows a method for solving production planning problems involving interval-valued costs, standard times and constraints. An iterative method is used to solve the fully production planning problem using a global satisfaction degree and it is applied to an inventory/shortage example.
| Idioma original | Inglés |
|---|---|
| Título de la publicación alojada | Fuzzy Information Processing 2020 Proceedings of the 2020 Annual Conference of the North American Fuzzy Information Processing Society, NAFIPS 2020 |
| Editorial | Springer |
| Páginas | 267-276 |
| Número de páginas | 10 |
| ISBN (versión digital) | 9783030815615 |
| ISBN (versión impresa) | 9783030815608 |
| DOI | |
| Estado | Publicada - dic. 9 2021 |
Áreas temáticas de ASJC Scopus
- Ingeniería industrial y de fabricación