Abstract
This paper shows a method for solving production planning problems involving interval-valued costs, standard times and constraints. An iterative method is used to solve the fully production planning problem using a global satisfaction degree and it is applied to an inventory/shortage example.
| Original language | English |
|---|---|
| Title of host publication | Fuzzy Information Processing 2020 Proceedings of the 2020 Annual Conference of the North American Fuzzy Information Processing Society, NAFIPS 2020 |
| Publisher | Springer |
| Pages | 267-276 |
| Number of pages | 10 |
| ISBN (Electronic) | 9783030815615 |
| ISBN (Print) | 9783030815608 |
| DOIs | |
| State | Published - Dec 9 2021 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 12 Responsible Consumption and Production
All Science Journal Classification (ASJC) codes
- Industrial and Manufacturing Engineering
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver